Repairs and Maintenance Policy

First ratified:Jul 2000
Last reviewed:Oct 2026
Last updated:Oct 2026

What to do in emergencies

  1. Emergency Contact Procedures:

    • Gas: If you smell gas, turn the gas off at the mains. Telephone National Grid. Report the matter to the Maintenance Co-ordinator or contact the Co-op office. Do not turn the gas back on until it has been repaired.

      IF IN ANY DOUBT, OR YOU SUSPECT A GAS LEAK, TELEPHONE THE NATIONAL GRID GAS EMERGENCY SERVICE: 0800 111 999

    • Water: If you have a burst pipe, turn the water off at the stop cock. The stop cock controls the water supply to the house and is under the kitchen sink. For any water repair, contact the Maintenance Co-ordinator or Co-op office. If you cannot contact anyone, for repairs inside the house call an emergency plumber on the Co-op's Approved builders list.
      • In Cambridge: Cambridge Water deals with the supply of water and maintains supply pipes up to the stop cock in the street. Anglian Water deals with sewerage and is responsible for maintaining the public sewers in the street.
      • External Failures: For repairs to water mains outside the house, call Cambridge Water on C. 403000. For repairs to sewerage pipes outside the house call Anglian Water on 0345 145145. For outside pavements and roads flooded because of blocked gullies ask for the Highways Dept of Cambridge City Council on C. 457000.
      • Supply Failure: If the water supply fails, telephone Cambridge Water. First, check with your next door neighbour, as the whole area may have been cut off. This will be Cambridge Water’s responsibility.
    • Electricity: If the electricity fails, or if you receive an electric shock from any fitting, turn off the electricity at the mains. To arrange for a repair, contact the Co-op Office or Maintenance Co-ordinator straight away. If no one is available, contact an emergency electrician who is on the Co-op's approved list, and provide a 24 hour service. Check that it is not a power cut if all electricity goes out!
  2. A laminated notice giving information on what to do in an emergency will be provided to each house. This information will also be included in the member's handbook.

Responsibility

The Co-op is responsible for the exterior and the structure of Co-op property, as well as installations for the supply of water, gas and electricity. Basins, sinks, baths, toilets, central heating and fitted heaters are also the responsibility of the Co-op. The Co-op is also responsible for all fittings supplied by the Co-op.

The Co-op is responsible for ensuring that all repairs are carried out in a professional and safe manner, and that no injury or damage is caused due to the Co-op's negligence.

It is a condition of membership that individual Co-op members are responsible for reporting repairs to the Co-op. Co-op members should be prepared to help with maintenance work.

Individual Co-op members are responsible for ensuring that there is no damage to Co-op property due to negligence or abuse. Damage resulting from negligence or abuse should be paid for by the members responsible.

Do it Yourself, work done by Co-op members, Co-op tools

The Co-op encourages members to undertake their own repairs, except in the areas of gas, electricity and water, where work must only be done by members with the relevant skills and qualifications.

In other cases, repairs still have to be reported to and authorised by the Maintenance Co-ordinator. Co-op members will not be paid for work, except in cases of emergency in which case the contractor will be paid, or the member reimbursed for payment to the contractor. N.B. Members are not allowed to be paid for maintenance work done under Co-op rules.

Co-op tools: are stored by the Maintenance Co-ordinators from whom they must be borrowed. Any member borrowing a Co-op tool must sign for it and return it. Tools must only be borrowed for use on Co-op property.

All tools must be signed in on return. Tools can be borrowed for a maximum of 72 hours. On return, the Maintenance Co-ordinator will check them for damage etc. It is critical that tools are returned on time. Any member damaging Co-op tools will be charged for repair/replacement. Any member not returning items borrowed from the maintenance group and/or damaging them and not being able to pay for repairs shall not be allowed to use items in the future.

Response Times

  1. There are four categories of repairs:
  • EMERGENCY REPAIRS: (Emergency Hazard) To be dealt with within 24 hours

    • No lights/power
    • Exposed wires/dangerous electrical fittings
    • Water penetration to electrics
    • Serious roof leak or damage through water penetration
    • Badly leaking water/central heating pipes
    • Gas/Carbon Monoxide leak
    • Broken glazing/glass where there is danger to life
    • External doors that are not secure
    • Severe damp and mould presenting that is having a material impact on a person’s health
    • Significant structural failure or risk of structural collapse
    • Damage to known asbestos or suspicious of asbestos present in property that has been damaged Where the property cannot be made safe within the required time frame, suitable alternative accommodation should be offered.
  • ESSENTIAL REPAIRS: (Significant Hazard) to deal with within 5 working days

    • No staircase lighting
    • Over heating of switches/sockets or flickering lights
    • Broken/cracked WC pan
    • Leaking flush pipe
    • Blocked drain/waste pipe
    • Broken joint of WC pan or soil pipe
    • Faulty ball valves
    • Non-emergency roof leaks
    • Broken/missing sections of guttering/rain water pipes
    • Cooker problems
    • Loose banisters/balustrades/stair treads
    • Damp or mould, left unaddressed that could potentially cause material impact on a persons health
    • Extraction or ventilation issues
    • Damaged fire doors or closers
  • PRIORITY REPAIRS: 15 working days

    • Non emergency glazing
    • External waste pipes
    • Refit of wash hand basin
    • Waste trap problems
    • Faulty drain valve/ Stopcock
    • Hinges on internal doors
    • Rotten/defective flooring
    • Blocked gutters
    • WC seats
  • ROUTINE REPAIRS: 30 working days

    • Bath panel/framework repairs
    • Loose kitchen worktops/units
    • WC seats
    • Replacement of wash hand basin, Bath
    • Tiling/sealing
    • Pointing around doors & windows
    • Fixing of air bricks/vents
    • Flooring repairs
    • Adjustment of external doors/frames
    • Leading on roof. Internal plasterwork. Pointing on brickwork

Maintenance Co-ordinators

  1. The Co-op will elect a Maintenance Co-ordinator(s) at the appropriate GM. They shall implement the Co-op's maintenance policy. They shall report regularly to the Co-op.
  2. The Co-op shall also have a Maintenance Group to provide support for the Maintenance Co-ordinator(s). The Group shall meet on a regular basis.
  3. The Maintenance Group shall also organise work done by Co-op members, particularly in the area of carpentry and joinery, glazing, painting and decorating.
  4. Work such as gas, electrical and plumbing work shall not be done by volunteers unless they have appropriate qualifications, as this could invalidate the Co-op's insurance.

Reporting a Repair

  • Report a repair: Can be reported in writing or verbally, in either case should eventually be formatted into a repair report form and filed. The Co-op will acknowledge the report back to the tenants, including the other tenants in the case of a shared house.
  • Investigate and assess repair: Carried out within 10 working days of the report, repair category assigned. (If the repair is suspected to be an emergency, this time frame shortens to be 24 hours to assess, and 24 hours to respond)
  • As part of assessing, the Co-op will also refer to known risk factors of existing tenants, and provide the opportunity to advise the Co-op of any present vulnerabilities, that may affect the urgency of the repair.
  • Tenant informed of repair timeframe within 3 working days.
  • Organise repair: Emergency within 24 hours, essential within 5 working days, priority within 15 working days, routine within 30 working days.
  • Upon completion: Repair closing form worked through with contractor and then with tenant, flag anything arising and assess satisfaction of repair.

reporting a repair flow diagram

Authorising Repairs

  1. The Maintenance Co-ordinator(s) shall take responsibility for ordering all repairs. They can delegate this responsibility and the authority to place orders to a Co-op worker, who must liaise closely with the Maintenance Co-ordinator.
  2. For works costing up to £1,000, the Maintenance Co-ordinator shall have authority to place orders. A written estimate must be obtained before work starts.
  3. For works costing £1,000 to £2,000, the Maintenance Co-ordinator shall have authority to place orders. At least two written estimates shall be obtained.
  4. Works costing over £2,000 shall be agreed at a General Meeting. At least two estimates shall be obtained for works up to £2,000, and three estimates for works over £2,000. The authorisation for such works shall be recorded in the minutes of the meeting.
  5. Using outside consultants (surveyors etc.) must be authorised by a General Meeting.
  6. Emergency Repairs: If an emergency arises that requires an immediate response to render the problem safe or secure, the obligation to receive written estimates in advance may be waived. The Maintenance Co-ordinators may authorise contractors verbally. An estimate for further work to resolve the problem permanently should be obtained and presented by the next GM if possible.

Paying for Repairs

  1. The Maintenance Co-ordinator and Treasurer shall be responsible for paying invoices; this work may be delegated to office workers. Works costing under £50 may be paid on the authorisation of the member that the work has been satisfactorily completed. For a job costing over £50, the appropriate Maintenance Co-ordinator shall inspect and authorise payment.
  2. The Co-op member who reported the work should sign the Repairs Report on completion, returning it promptly to the Office only if satisfied with the standard of work.
  3. The invoice from the builder and the original estimate (where appropriate) shall be passed to the Treasurer or office workers. They shall check these against the original work order and authorise payment when all paperwork is correct.
  4. The Co-op shall receive a report each quarter on the maintenance budget.

Planned and Cyclical Maintenance

  1. The Maintenance Co-ordinator shall annually inspect all houses and flats. Repairs arising from the inspection (unless urgent or emergency) shall be ordered as part of the cyclical maintenance work for that property during that year.
  2. The following work shall be done on an annual basis:
    • Checking and cleaning of gutters
    • Maintenance of fences and boundary walls
    • Inspection and cleaning of drains
    • Servicing of gas boilers and cookers
    • Inspection and repair of windows and doors
    • Exterior cleaning of windows
    • Oiling of window parts
  3. The following work shall be organised on a 5-yearly basis:
    • External inspection of wood, repainting/replacing as required.
    • Repainting of internal communal areas. The Co-op will supply paint, and the work shall be done by the members of each house.
    • All void rooms shall be inspected when a member moves out, and repairs organised if possible before the room is re-let.
    • The Co-op shall not be responsible for the decoration of members' rooms. These must be kept in good condition. The Co-op has a trade account with a local supplier and will provide free silk or matt emulsion and gloss paint to decorate a room. The Co-op’s Paint Co-ordinator or Maintenance Co-ordinator organises getting the paint, tinting etc. The work shall be done by members living in the house (See the Co-op’s paint policy).

Contractors List

  1. The Co-op will keep a list of reputable contractors and review it regularly. Any builder who fails to provide a good service or fails to abide by the Co-op's policies will be taken off the list. However, problems should be discussed with them first, giving them a chance to remedy the faults.
  2. All builders will receive a copy of this repairs and maintenance policy. They should also be issued with an anti-discrimination statement by the Co-op, which they must sign and abide by. Breaches will result in removal from the list.
  3. All contractors should be able to produce on request:
    • A Tax exemption certificate (if appropriate)
    • Public liability insurance
    • References (trade and bank)
    • VAT registration number (if appropriate)
    • NIC/EIC membership for electrical work
    • Gas Safe membership for gas work
  4. For contractors with over 5 staff: A health and safety policy and an equal opportunities policy.
  5. All contractors should be sympathetic to trade and should avoid employing casual labour.

Members rights

  1. The Maintenance Co-ordinator shall inspect work done before authorising payment. Should a member be unhappy with repairs, they must report this to the Maintenance Co-ordinator before payment.
  2. Once a repair has been reported, should the Co-op fail to organise it as outlined here, the member should raise the matter with the Maintenance Co-ordinator. Section 12 below covers the member's contractual "Right to repair" under their Tenancy Agreement.
  3. The Co-op will not take responsibility for repairs ordered outside this system, except in cases of extreme urgency where immediate action prevents further damage to Co-op property.
  4. The Maintenance Policy is a document of the Co-op, and can be added to or changed only through the democratic process of the Co-op.

The Right to Repair compensation scheme

  1. This scheme is a contractual right that the Tenant Services Authority expects Registered Social Landlords to grant to tenants. The scheme is referred to in the Co-op's current tenancy agreement.
  2. The maximum cost for a repair eligible for this scheme will be £200.
  3. If a member reports an emergency or essential repair, the Co-op will issue a work order describing the repair, the contractor, and completion date. The member should co-operate with the contractor in providing access.
  4. If the Co-op fails to carry out the repair within the timescale (24 hours for emergency, 5 working days for essential), the member should inform the Co-op. The Co-op should then issue a further work order and give a copy to the tenant.
  5. If the repair remains outstanding after this second period, the member shall be entitled to compensation. The compensation will be £10 plus £2 per day (up to a maximum of £50) for every day it remains outstanding.
  6. A Maintenance Co-ordinator, or in their absence, a General Meeting, must authorise all payments under this scheme.

Monitoring the Repairs Service

  1. The Maintenance Co-ordinator shall report every quarter to the General Meeting about the Repairs Service. The Committee shall be responsible for monitoring the Repairs service.
  2. If less than 90% of the repairs are being done within the target times, the Co-op Co-ordinators will investigate and report back to a General Meeting.

The Repairs system

  1. Once a repair request is received in the Office, the Maintenance Co-ordinator or office worker issues a work order, having inspected it if necessary and established it is the Co-op's responsibility.
  2. A copy of the work order goes to the house, and a copy is kept on file. Once the invoice is passed for payment, the office copy goes onto the property file.
  3. A record shall be kept of all orders placed on each property, to include expenditure and committed expenditure.
  4. In the case of major works (roofs, damp proofing, etc.), copies of guarantees shall be kept on the property file.
  5. All repairs must be entered into the maintenance database.

Procurement

  1. Wherever possible, the Co-op shall endeavour to procure its own items for installation or repair.
  2. The Co-op is currently a member of the Procurement for Housing Scheme and has accounts with various members of this scheme.
  3. It is the Maintenance Co-ordinator’s or office worker’s duty to ensure that all accounts are active on the procurement for housing scheme.
  4. If the Co-op holds or maintains an account card for the Procurement for Housing scheme, then the card should be kept in the office at all times unless it is being used for a purchase.
  5. It is the Maintenance Co-ordinator's or office worker’s duty to keep a close eye on purchases using the centralised billing website provided by CEL.
  6. If the purchase cannot be made by the Co-op team directly, they may delegate this to the contractor; in doing so, a surcharge of no more than 30% of the total item cost under the Procurement for Housing scheme shall be liable to the contractor by the Co-op.
  7. If the Co-op team handles the purchasing directly, a surcharge of no more than 10% of the materials cost shall be paid to the contractor for materials on the agreed list.

October 7th 2021 amendment - power sockets and area access

The following were voted on in the GM of 7/10/2021 but no discussion was had in terms of how to integrate the decisions within the policy

  • Power Sockets: Bedroons across all propeties to be upgraded to have 3 double electrical sockets at member request or when a room become void
  • Policy on access to contractors: Members should ensure that contractors have access to areas in the properties required to carry out their work

September 7th 2022 amendmement - bathroom fans

That the co-op adopts an overall policy of installing and allowing to operate automated humidistat fans across site to keep on top of damp and mould issues in bathrooms." Addressed tension between energy-efficient automated fans and members' preference for manual on/off control.

Legislation and Policy Review

The Maintenance Group will co-ordinate reviews of this policy at least annually to establish best practice and ensure compliance with legislation.

The repair priorities and repair reporting procedure have been amended in October 2026 to bring practice in line with Awaab’s Law, enacted as part of the Social Housing (Regulation) Act 2023.